Upgrading of North Port Road From Klang Container Terminal (KCT) To Northport, Port Klang, Selangor.
Location : Klang, Selangor
Completion Year : 2017
Description :
Formation : Soft Clay
Approach : River Crossing
Horizontal Directional Drilling Installation Work at Mersing, Johor
Location : Mersing, Johor
Completion Year : 2017
Description :
HDPE 5″ Pipe Size
Formation : Sand
Approach : Shore Approach
Procurement, Construction And Commissioning (PCC) Of Pengerang Gas Pipeline Project
Location : Pengerang, Johor
Completion Year : 2017
Description :
Formation : Rock
Approach : River Crossing
EPCC For Pipeline Replacement Project At Sg. Skudai Johor (PIRESS).
Misi Setia Oil & Gas Sdn bhd
Location : Sungai Skudai, Johor.
Completion Year : 2016
Description :
Formation : Rock
Approach : River Crossing
Pipe replacement project from Pulau Indah to Pulau Ketam
Jabatan Bekalan Air, Malaysia
Location : Pulau Ketam, Klang, Malaysia
Completion Year : 2015
Description :
Formation : Sandy clay and Marine Clay
Approach : Sea Crossing
Terengganu Gas Terminal (TGAST) Project.
Samsung Engineering (Malaysia) Sdn Bhd
Location : Kerteh, Terengganu.
Completion Year : 2015
Description :
6” Electrical Conduit
6” Electical Conduit
Formation : Sandy Silt Clay
Approach : Highway Crossing
Harbour Area Treatment Scheme (HATS) Stage 2A, Construction of Sewage Conveyance System from Ap Lei Chau to Aberdeen, Hong Kong. Horizontal Directional Drilling Works.
Paul Y Construction Co. Ltd
Location : Ap Lei Chau /Aberdeen, Hong Kong
Completion Year : 2014
Description :
Formation : Granite Hard Rock Drilling
Approach : Harbour Crossing
Proposed Horizontal Directional Drilling Works for River Crossing
PT Kaliraya Sari
Location : Balik Papan
Completion Year : 2012
Description :
14″ Ø Steel pipe
14″ Ø Steel pipe
Formation : Sandy and Silty Clay
Approach : River Crossing
EPCC of Fuel Hydrant Pipeline Network System and Associated Works at KLIA2
Maxwell Energy Sdn Bhd & JV Accent Technique Sdn Bhd
Location : Selangor, Malaysia
Completion Year : 2011
Description :
3 way 6” Black Pipe
1 way 24” Ø API Pipe
Formation : Sandy Stone/Sandy Clay
Approach : Runway Crossing
Construction of 20” (508mm) OD High Pressure Natural Gas Pipeline by HDD method Across Karnafuli River at Kalurghat, Chittagong, Bangladesh
Gas Utilization Services Limited / Bakhrabad Gas Systems
Location : Karnafuli River At Kalurghat, Bangladesh.
Completion Year : 2010
Description :
Formation : Sandy Clay and Silty Clay
Approach : River Crossing
EPPC Of The NGDS To Seri Kembangan FL Stage 1/09, Seri Kembangan, Selangor Darul Ehsan.
Misi Setia Oil & Gas Sdn Bhd (538932-W)
Location : Selangor, Malaysia
Completion Year : 2010
Description :
1 Way 8″ Steel Gas Pipe
1 Way 6″ Steel Gas Pipe
1 Way 4″ Steel Gas Pipe
Formation: Sandy Clay
Approach : Road Crossing
Horizontal Directional Drilling (HDD) Works At TTU - TUBAN
PT Citra Panji Manunggal
Location : Surabaya, Indonesia
Completion Year : 2008
Description :
Formation : Sandy and Silty Clay
Approach : River Crossing
Horizontal Directional Drilling Works at Jambi Merang
PT Citra Panji Manunggal
Location : Jambi Merang, Indonesia
Completion Year : 2008
Description :
8″ Ø API PIPES & 101mm (4″) Ø Fiber Optic Casing
12″ Ø API PIPES & 101mm (4″) Ø SS316 Pipe
Formation : Sandy and Silty Clay
Approach : River Crossing
Inter Refineries Pipelines (IRP) Project (Takreer), Abu Dhabi, UAE - Project No. 6089. Engineering, Procurement, Construction & Commissioning (EPC) Works - Agreement No. 03-089-E1.
Dodsal Pte. Ltd
Location : Takreer , Abu Dhabi
Completion Year : 2007
Description :
Formation : Mud Stone
Approach : Highway Crossing
EPCC OF ngds To Pualau Indah, West Port FL Stage 1/05, Selangor
Time Dot Com
Location : Klang, Malaysia
Completion Year : 2006
Description :
Formation : Sandy Silk
Approach : Barge to Barge
Horizontal Directional Drilling Works At Hou Lung River, Taiwan.
Formosa Petrochemical / Trans-Asia Consulting & Trade., Ltd.
Location : Taiwan R.O.C
Completion Year : 2006
Description :
Formation : Mud Stone
Approach : River Crossing
Installation of Pipelines Across Rivers, Road and Railway for Pertamina
Japan Drilling Co. Ltd.
Location : South Sumatera Gas Development Pipeline Project, Indonesia
Completion Year : 2005
Description :
28″ NPS Gas Pipe
28″ NPS Gas Pipe
20″ NPS Gas Pipe
28″ NPS Gas Pipe
32″ NPS Gas Pipe
Formation : Sandy and Silty Clay
Approach : River Crossing
EPCC of NGDS To Pulau Indah, West Port FL Stage 1/05
Gas Malaysia Berhad
Location : West Port, Klang, Malaysia
Completion Year : 2005
Description :
Formation : Soft Marine Clay
Approach : River Crossing
Horizontal Directional Drilling works at Singapore Changi Airport (Contract A)
Hwa Seng Builders Pte Ltd.
Location : Singapore
Completion Year : 2005
Description :
4 way 4” Ø HDPE
4 way 6” Ø HDPE
4 way 6” Ø HDPE
Formation : Sandy Clay
Approach : Runway Crossing
Trenching works for 312KV Cable route from “Wong Chuk Hand to – Deep Water Bay” & Curve Directional Drilling Works from “South Bay to Chung Hum Kok”
Wo Hing Construction Co, Ltd / Utilities Construction Ltd. Hong Kong
Location : Chung Hom Kok, Hong Kong
Completion Year : 2004
Description :
Formation : Hard Rock Drilling
Approach : Hill Crossing
Water Supply to Tap Mun – Laying of Submarine pipeline
Wo Hing Construction Co., Ltd
Location : Tap Mun, Hong Kong
Completion Year : 2003
Description :
5″Ø HDPE Water pipe
Formation : Hard Rock Drilling
Approach : Island to Island
Globe Telecoms Manila - Tarlac FOC Network Project
BPL Philippines, Inc.
Location : Philippines, Manila
Completion Year : 2002
Description :
Formation : Silty Clay
Approach : River Crossing
The Design, Construction And Commissioning Of CPC-Crossing Ching Mei River
I-Ting Engineering Co. Ltd.
Location : Ching Mei River, Taiwan
Completion Year : 2001
Description :
Formation : Sandy Clay
Approach : River Crossing
Laying of Pipeline through HDD in Cochin. Karar pipeline for Petronek CCK Ltd.
Petronek CCK Ltd
Location : Coshin, India
Completion Year : 1999
Description :
Approach : River Crossing