Featured Projects


null

Upgrading of North Port Road From Klang Container Terminal (KCT) To Northport, Port Klang, Selangor.

+More Details
Client : ACE Energy Sdn Bhd

Location : Klang, Selangor

Completion Year : 2017

Description :

  • Pipe Size : 16” API Gas Pipe
  • Pipe Length : 400m pipe length

Formation : Soft Clay

Approach : River Crossing

null

Horizontal Directional Drilling Installation Work at Mersing, Johor

+More Details
Optic Marine Services

Location :  Mersing, Johor

Completion Year : 2017

Description :

  • Pipe Size : HDPE 6″ Pipe Size

 HDPE 5″ Pipe Size

  • Pipe Length :80m + 250m = 330m

Formation : Sand

Approach : Shore Approach

null

Procurement, Construction And Commissioning (PCC) Of Pengerang Gas Pipeline Project

+More Details

Location : Pengerang, Johor

Completion Year : 2017

Description :

  • Pipe Size : 36″ Diameter API Gas Pipe
  • Pipe Length : 600m + 850m + 660m = 2110m

Formation : Rock

Approach : River Crossing

EPCC For Pipeline Replacement Project At Sg. Skudai Johor (PIRESS).

+More Details

Misi Setia Oil & Gas Sdn bhd

Location : Sungai Skudai, Johor.

Completion Year : 2016

Description :

  • Pipe Size : 30” API Gas Pipe
  • Pipe Length : 308m pipe length

Formation : Rock

Approach : River Crossing

Pipe replacement project from Pulau Indah to Pulau Ketam

+More Details

Jabatan Bekalan Air, Malaysia

Location : Pulau Ketam, Klang, Malaysia

Completion Year : 2015

Description :

  • Pipe Size : 16” Ø FBE coated API steel pipe
  • Pipe Length : 1959 m

Formation : Sandy clay and Marine Clay

Approach : Sea Crossing

Terengganu Gas Terminal (TGAST) Project.

+More Details

Samsung Engineering (Malaysia) Sdn Bhd

Location : Kerteh, Terengganu.

Completion Year : 2015

Description :

  • Pipe Size : 28″ Electrical Conduit

 6” Electrical Conduit

 6” Electical Conduit

  • Pipe Length : 760m + 167m + 70m = 997m

Formation : Sandy Silt Clay

Approach : Highway Crossing

Harbour Area Treatment Scheme (HATS) Stage 2A, Construction of Sewage Conveyance System from Ap Lei Chau to Aberdeen, Hong Kong. Horizontal Directional Drilling Works.

+More Details

Paul Y Construction Co. Ltd

Location : Ap Lei Chau /Aberdeen, Hong Kong

Completion Year : 2014

Description :

  • Pipe Size : Hole Size Ø 740mm (29.1″) HDPE PE100 – Sewerage Pipe Installation
  • Pipe Length :  1,400m x 2 crossings

Formation : Granite Hard Rock Drilling

Approach : Harbour Crossing

Proposed Horizontal Directional Drilling Works for River Crossing

+More Details

PT Kaliraya Sari

Location : Balik Papan

Completion Year : 2012

Description :

  • Pipe Size : 14″ Ø Steel pipe

14″ Ø Steel pipe

14″ Ø Steel pipe

  • Pipe Length : 1365m + 1000m + 600m = 2965m

Formation : Sandy and Silty Clay

Approach : River Crossing

EPCC of Fuel Hydrant Pipeline Network System and Associated Works at KLIA2

+More Details

Maxwell Energy Sdn Bhd & JV Accent Technique Sdn Bhd

Location : Selangor, Malaysia

Completion Year : 2011

Description : 

  • Pipe Size : 1 way 24” Ø API Steel Pipe

3 way 6” Black Pipe

1 way 24” Ø API Pipe

  • Pipe Length :  410m + 891m = 1301m

Formation : Sandy Stone/Sandy Clay

Approach : Runway Crossing

Construction of 20” (508mm) OD High Pressure Natural Gas Pipeline by HDD method Across Karnafuli River at Kalurghat, Chittagong, Bangladesh

+More Details

Gas Utilization Services Limited / Bakhrabad Gas Systems

Location : Karnafuli River At Kalurghat, Bangladesh.

Completion Year : 2010

Description :

  • Pipe Size : 20″ Ø High Pressure Natural Gas Pipeline
  • Pipe Length : 1200m

Formation : Sandy Clay and Silty Clay

Approach : River Crossing

EPPC Of The NGDS To Seri Kembangan FL Stage 1/09, Seri Kembangan, Selangor Darul Ehsan.

+More Details

Misi Setia Oil & Gas Sdn Bhd (538932-W)

Location : Selangor, Malaysia

Completion Year : 2010

Description :

  • Pipe Size : 1 Way 16″ Steel Gas Pipe

1 Way 8″ Steel Gas Pipe

1 Way 6″ Steel Gas Pipe

1 Way 4″ Steel Gas Pipe

  • Pipe Length : 84m + 2370m + 60m + 87m = 2601m

Formation: Sandy Clay

Approach : Road Crossing

Horizontal Directional Drilling (HDD) Works At TTU - TUBAN

+More Details

PT Citra Panji Manunggal

Location : Surabaya, Indonesia

Completion Year : 2008

Description :

  • Pipe Size :  16″ Ø API 5L X 46 Pipeline
  • Pipe Length : 855m

Formation : Sandy and Silty Clay

Approach : River Crossing

Horizontal Directional Drilling Works at Jambi Merang

+More Details

PT Citra Panji Manunggal

Location : Jambi Merang, Indonesia

Completion Year : 2008

Description :

  • Pipe Size : 8″ Ø  API PIPES & 101mm  (4″) Ø  Fiber Optic Casing

8″ Ø API PIPES & 101mm (4″) Ø Fiber Optic Casing

12″ Ø API PIPES & 101mm (4″) Ø SS316 Pipe

  • Pipe Length : 1600m + 450m = 2,050m

Formation : Sandy and Silty Clay

Approach : River Crossing

Inter Refineries Pipelines (IRP) Project (Takreer), Abu Dhabi, UAE - Project No. 6089. Engineering, Procurement, Construction & Commissioning (EPC) Works - Agreement No. 03-089-E1.

+More Details

Dodsal Pte. Ltd

Location : Takreer , Abu Dhabi

Completion Year : 2007

Description :

  • Pipe Size : 6 Crossings 30″ API Gas Pipe
  • Pipe Length : 1,655m

Formation : Mud Stone

Approach : Highway Crossing

EPCC OF ngds To Pualau Indah, West Port FL Stage 1/05, Selangor

+More Details

Time Dot Com

Location : Klang, Malaysia

Completion Year : 2006

Description :

  • Pipe Size : 8” Ø HDPE Casing
  • Pipe Length :  842m

Formation : Sandy Silk

Approach : Barge to Barge

Horizontal Directional Drilling Works At Hou Lung River, Taiwan.

+More Details

Formosa Petrochemical / Trans-Asia Consulting & Trade., Ltd.

Location : Taiwan R.O.C

Completion Year : 2006

Description :

  • Pipe Size : 4 ways 12″ API In Bundle
  • Pipe Length : 1002m

Formation : Mud Stone

Approach : River Crossing

Installation of Pipelines Across Rivers, Road and Railway for Pertamina

+More Details

Japan Drilling Co. Ltd.

Location : South Sumatera Gas Development Pipeline Project, Indonesia

Completion Year : 2005

Description :

  • Pipe Size : 28″ NPS Gas Pipe

28″ NPS Gas Pipe

28″ NPS Gas Pipe

20″ NPS Gas Pipe

28″ NPS Gas Pipe

32″ NPS Gas Pipe

  • Pipe Length : 485m + 347m + 391m + 399m + 445m + 465m = 2,532m

Formation : Sandy and Silty Clay

Approach : River Crossing

EPCC of NGDS To Pulau Indah, West Port FL Stage 1/05

+More Details

Gas Malaysia Berhad

Location : West Port, Klang, Malaysia

Completion Year : 2005

Description :

  • Pipe Size : 16” Ø Steel Gas Pipeline
  • Pipe Length : 936m

Formation : Soft Marine Clay

Approach : River Crossing

Horizontal Directional Drilling works at Singapore Changi Airport (Contract A)

+More Details

Hwa Seng Builders Pte Ltd.

Location : Singapore

Completion Year : 2005

Description :

  • Pipe Size : 4 way 6” Ø HDPE

4 way 4” Ø HDPE

4 way 6” Ø HDPE

4 way 6” Ø HDPE

  • Pipe Length : 672m

Formation : Sandy Clay

Approach : Runway Crossing

Trenching works for 312KV Cable route from “Wong Chuk Hand to – Deep Water Bay” & Curve Directional Drilling Works from “South Bay to Chung Hum Kok”

+More Details

Wo Hing Construction Co, Ltd / Utilities Construction Ltd. Hong Kong

Location : Chung Hom Kok, Hong Kong

Completion Year : 2004

Description :

  • Pipe Size : HDPE SDR II 280mm (11”) Ø / 132KV Cable Route
  • Pipe Length : 1104m

Formation : Hard Rock Drilling

Approach : Hill Crossing

Water Supply to Tap Mun – Laying of Submarine pipeline

+More Details

Wo Hing Construction Co., Ltd

Location : Tap Mun, Hong Kong

Completion Year : 2003

Description :

  • Pipe Size : 8″Ø HDPE Water pipe

5″Ø HDPE Water pipe

  • Pipe Length : 640m

Formation : Hard Rock Drilling

Approach : Island to Island

Globe Telecoms Manila - Tarlac FOC Network Project

+More Details

BPL Philippines, Inc.

Location : Philippines, Manila

Completion Year : 2002

Description :

  • Pipe Size : Hole Size 16” Ø HDPE Pipe
  • Pipe length : 631m

Formation : Silty Clay

Approach : River Crossing

The Design, Construction And Commissioning Of CPC-Crossing Ching Mei River

+More Details

I-Ting Engineering Co. Ltd.

Location : Ching Mei River, Taiwan

Completion Year : 2001

Description :

  • Pipe Size : 16″ Ø Nominal Pipe Size
  • Pipe Length : 1260m

Formation : Sandy Clay

Approach : River Crossing

Laying of Pipeline through HDD in Cochin. Karar pipeline for Petronek CCK Ltd.

+More Details

Petronek CCK Ltd

Location : Coshin, India

Completion Year : 1999

Description : 

  • Pipe Size : 18“ Ø API Steel Gas Pipes
  • Pipe Length : 330m + 300m + 290m = 920m

Approach : River Crossing


  • About Mersing

    Mersing is a premier trenchless construction and engineering service provider founded in Malaysia, with a vast experience across 9 countries in Asia, an extensive fleet of drilling rigs accompanied by a dedicated team of engineers who are highly competent, knowledgeable and well trained in the fields of Horizontal Directional Drilling and Microtunneling.
  • Quick Links

    • Company
    • Horizontal Directional Drilling
    • Pipe Jacking
    • Other Trenchless Services
    • Contact
  • Headquarters

    84, Jalan SG 4/8, Taman Sri Gombak,
    68100 Batu Caves,
    Selangor Darul Ehsan
    Malaysia

    T : +603 6186 1333
    F : +603 6188 8866
    E : mmce@mersing-group.com

© Copyright 2026 Mersing Group of Companies. All Rights Reserved.