Upgrading of North Port Road From Klang Container Terminal (KCT) To Northport, Port Klang, Selangor.
Client : ACE Energy Sdn Bhd
Location : Klang, Selangor
Completion Year : 2017
Description :
Formation : Soft Clay
Approach : River Crossing
Client : Optic Marine Services
Location : Mersing, Johor
Completion Year : 2017
Description :
HDPE 5″ Pipe Size
Formation : Sand
Approach : Shore Approach
Client : PBJV Berhad
Location : Pengerang, Johor
Completion Year : 2017
Description :
Formation : Rock
Approach : River Crossing
Client : Misi Setia Oil & Gas Sdn bhd
Location : Sungai Skudai, Johor.
Completion Year : 2016
Description :
Formation : Rock
Approach : River Crossing
Client : Jabatan Bekalan Air, Malaysia
Location : Pulau Ketam, Klang, Malaysia
Completion Year : 2015
Description :
Formation : Sandy clay and Marine Clay
Approach : Sea Crossing
Client : Samsung Engineering (Malaysia) Sdn Bhd
Location : Kerteh, Terengganu.
Completion Year : 2015
Description :
6” Electrical Conduit
6” Electical Conduit
Formation : Sandy Silt Clay
Approach : Highway Crossing
Harbour Area Treatment Scheme (HATS) Stage 2A, Construction of Sewage Conveyance System from Ap Lei Chau to Aberdeen, Hong Kong. Horizontal Directional Drilling Works.
Client : Paul Y Construction Co. Ltd
Location : Ap Lei Chau /Aberdeen, Hong Kong
Completion Year : 2014
Description :
Formation : Granite Hard Rock Drilling
Approach : Harbour Crossing
Client : PT Kaliraya Sari
Location : Balik Papan
Completion Year : 2012
Description :
14″ Ø Steel pipe
14″ Ø Steel pipe
Formation : Sandy and Silty Clay
Approach : River Crossing
Client : Maxwell Energy Sdn Bhd & JV Accent Technique Sdn Bhd
Location : Selangor, Malaysia
Completion Year : 2011
Description :
3 way 6” Black Pipe
1 way 24” Ø API Pipe
Formation : Sandy Stone/Sandy Clay
Approach : Runway Crossing
Construction of 20” (508mm) OD High Pressure Natural Gas Pipeline by HDD method Across Karnafuli River at Kalurghat, Chittagong, Bangladesh
Client : Gas Utilization Services Limited / Bakhrabad Gas Systems
Location : Karnafuli River At Kalurghat, Bangladesh.
Completion Year : 2010
Description :
Formation : Sandy Clay and Silty Clay
Approach : River Crossing
Client : Misi Setia Oil & Gas Sdn Bhd (538932-W)
Location : Selangor, Malaysia
Completion Year : 2010
Description :
1 Way 8″ Steel Gas Pipe
1 Way 6″ Steel Gas Pipe
1 Way 4″ Steel Gas Pipe
Formation: Sandy Clay
Approach : Road Crossing
Client : PT Citra Panji Manunggal
Location : Surabaya, Indonesia
Completion Year : 2008
Description :
Formation : Sandy and Silty Clay
Approach : River Crossing
Client : PT Citra Panji Manunggal
Location : Jambi Merang, Indonesia
Completion Year : 2008
Description :
8″ Ø API PIPES & 101mm (4″) Ø Fiber Optic Casing
12″ Ø API PIPES & 101mm (4″) Ø SS316 Pipe
Formation : Sandy and Silty Clay
Approach : River Crossing
Inter Refineries Pipelines (IRP) Project (Takreer), Abu Dhabi, UAE - Project No. 6089. Engineering, Procurement, Construction & Commissioning (EPC) Works - Agreement No. 03-089-E1.
Client : Dodsal Pte. Ltd
Location : Takreer , Abu Dhabi
Completion Year : 2007
Description :
Formation : Mud Stone
Approach : Highway Crossing
Client : Time Dot Com
Location : Klang, Malaysia
Completion Year : 2006
Description :
Formation : Sandy Silk
Approach : Barge to Barge
Client : Formosa Petrochemical / Trans-Asia Consulting & Trade., Ltd.
Location : Taiwan R.O.C
Completion Year : 2006
Description :
Formation : Mud Stone
Approach : River Crossing
Client : Japan Drilling Co. Ltd.
Location : South Sumatera Gas Development Pipeline Project, Indonesia
Completion Year : 2005
Description :
28″ NPS Gas Pipe
28″ NPS Gas Pipe
20″ NPS Gas Pipe
28″ NPS Gas Pipe
32″ NPS Gas Pipe
Formation : Sandy and Silty Clay
Approach : River Crossing
Client : Gas Malaysia Berhad
Location : West Port, Klang, Malaysia
Completion Year : 2005
Description :
Formation : Soft Marine Clay
Approach : River Crossing
Client : Hwa Seng Builders Pte Ltd.
Location : Singapore
Completion Year : 2005
Description :
4 way 4” Ø HDPE
4 way 6” Ø HDPE
4 way 6” Ø HDPE
Formation : Sandy Clay
Approach : Runway Crossing
Trenching works for 312KV Cable route from “Wong Chuk Hand to – Deep Water Bay” & Curve Directional Drilling Works from “South Bay to Chung Hum Kok”
Client : Wo Hing Construction Co, Ltd / Utilities Construction Ltd. Hong Kong
Location : Chung Hom Kok, Hong Kong
Completion Year : 2004
Description :
Formation : Hard Rock Drilling
Approach : Hill Crossing
Client : Wo Hing Construction Co., Ltd
Location : Tap Mun, Hong Kong
Completion Year : 2003
Description :
5″Ø HDPE Water pipe
Formation : Hard Rock Drilling
Approach : Island to Island
Client : BPL Philippines, Inc.
Location : Philippines, Manila
Completion Year : 2002
Description :
Formation : Silty Clay
Approach : River Crossing
Client : I-Ting Engineering Co. Ltd.
Location : Ching Mei River, Taiwan
Completion Year : 2001
Description :
Formation : Sandy Clay
Approach : River Crossing
Client : Petronek CCK Ltd
Location : Coshin, India
Completion Year : 1999
Description :
Approach : River Crossing